{"id":5738,"date":"2022-07-12T11:21:38","date_gmt":"2022-07-12T11:21:38","guid":{"rendered":"https:\/\/tecsat.es\/?p=5738"},"modified":"2022-09-16T11:30:41","modified_gmt":"2022-09-16T11:30:41","slug":"64-kwp-para-la-gasolinera-de-el-altet","status":"publish","type":"post","link":"https:\/\/tecsat.es\/en\/64-kwp-para-la-gasolinera-de-el-altet\/","title":{"rendered":"64 kWp of solar energy for the petrol station in El Altet"},"content":{"rendered":"
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

The work carried out at the El Altet petrol station, in collaboration with Atersa-Elecnor, has been one of the largest for TECSAT in recent months. The technicians have installed a total of 143 solar panels of 450 Wp, a 60 kW three-phase inverter, an electric vehicle charging point and a whole deployment of metal and concrete supports for the optimal orientation of the panels.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t

\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\"S1218-Altet-1\"\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t

Installed equipment:<\/span><\/strong><\/p>

\u2705 143 paneles Atersa.Shop 450Wp<\/span>
\u2705 Huawei three-phase inverter 60 kWn<\/span>
\u2705 Recharging point\u00a0Ingeteam\u00a0Ingerev Fusion Street<\/span>
\u2705 Solarbloc solar panel brackets<\/span>
\u2705 Sunfer metal brackets<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t

\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t